Bags vs ready-mix

How much concrete
does this pour take?

Cubic yards, bags and the delivered order — for a slab, a footing or a post. And the number that actually decides it: where a ready-mix truck stops being the expensive option.

ft
ft
in
4 in is a walkway or patio. 5–6 in once vehicles drive on it.
Concrete to order
1.36 cu yd
≈ 82 bags of 60 lb · or 1.5 cu yd delivered
Surface area100 sq ft
Volume, before over-order1.23 cu yd
With over-order1.36 cu yd
Bags needed82
Ready-mix order1.5 cu yd
Estimated weight2.7 tons
Slab 60 lb bags 10% over-order

Bags or a ready-mix truck?

Both paths priced on the same volume. This is the decision most calculators leave you to guess.

Bagged
82 bags
$558
haul it yourself, mix on site
Ready-mix
1.5 cu yd + short load
$318
delivered, poured in one go
Ready-mix comes out about $240 cheaper here.
With these prices the two paths cross at about 0.3 cu yd.

What a ready-mix plant will charge

Typical delivered ranges are below. Your yardage is calculated above — quote it to the plant when you call.

Typical delivered price: $150–$190 per cu yd, short load fee under 3 cu yd

What the pour looks like

Length, width and thickness set the volume. The pour fills the form; the bag count is that volume divided by what one bag yields, plus your over-order.

The concrete fills from the bottom up.
Concrete Soil / subgrade

What one bag actually yields

Every bag size is sold by weight but pours by volume. This is the conversion that makes the bag count real.

BagYieldBags per cu ydTypical pour
40 lb0.30 cu ft90Post holes, small repairs
50 lb0.375 cu ft72Fence posts, curbs
60 lb0.45 cu ft60Slabs up to about 1 cu yd
80 lb0.60 cu ft45Footings, thicker pads
Yields are for standard ready-to-use mixes. Add water per the bag, not per the bucket — extra water is the most common reason a slab fails.

Watch the bag count worked out for a slab

A third-party tutorial on YouTube — not our footage. Nothing loads until you press play; the measurements and opinions belong to the channel, not to us.

How many bags of concrete should I buy? video thumbnail from Stan Stallings 2:51
Video · YouTube

How many bags of concrete should I buy?

Stan Stallings runs a slab through the 80 lb bag maths — area, thickness and the bag count that comes out. Runs 2:51.

By Stan Stallings·2:51·Open on YouTube

What to actually buy

Concrete is bought as bags from the shelf or as a truck of ready-mix with a minimum order. This puts both routes in money on the same line.

Shopping
Purchase
Bags needed82 bags
Mix left after pour—
Ready-mix yards1.5 yd
Volume with waste1.5 cu yd
Weight4900 lb
Bag route--
Truck route--
The volume already includes your waste percentage. Bag route is counted at the yield on your bag; the truck route rounds up to the short-load minimum, because a part load is charged like a full one.
Budget
Concrete
Accessories
Waste & rounding
Delivery
Labor
Sales tax
Total
Bag and yard prices come from the panel above; the short-load fee follows the truck route. Accessories means forms, rebar, a float and a hose — type your own number.
Where these numbers come from+

Formats assumed. A 60 lb bag yields about 0.45 cu ft, an 80 lb bag about 0.6. Ready-mix is sold in whole cubic yards with a minimum order and a short-load fee for anything under it.

Not from us. Bag price, yard price, short-load fee and minimum order all come from the fields above. Yields differ by mix, so the bag line is an estimate until you read the bag you actually buy.

The formula, step by step

Volume first, then bags. Nothing here depends on the material brand.

slab: cu ft = length × width × (thickness / 12)
column: cu ft = π × (diameter / 24)² × height
cu yd = cu ft / 27 × (1 + over-order)
bags = cu ft × (1 + over-order) / bag yield

Worked example

A 10 × 10 ft pad at 4 in: 100 sq ft × 0.333 ft = 33.3 cu ft, which is 1.23 cu yd. Add 10% and it is 1.36 cu yd — about 82 bags of 60 lb, or 1.5 cu yd once the plant rounds up to the next quarter yard.

When bags are the right answer

Three cases: the truck cannot reach the pour, the volume is under about half a yard, or you are pouring in stages over several days. Otherwise the bag price per cubic yard runs two to three times the delivered price, before you count your own mixing time.

Assumptions & limits

  • Volume is geometric only — no allowance for reinforcement displacement.
  • Ready-mix is rounded up to the next 0.25 cu yd, as most plants quote.
  • Short-load fee assumed flat and applied below the order threshold you set.
  • Weight estimated at 4,050 lb per cu yd for standard 4,000 psi mix.
  • No pump, chute extension, or waiting-time charges included.
  • Prices are USD estimates, not live quotes; plants price by zone and season.

Last reviewed

November 19, 2026 — bag yields and 2026 plant pricing re-checked.

Common questions

How many bags of concrete for a 10 × 10 slab at 4 inches?+
1.23 cu yd before over-order, 1.36 after. That is 82 bags of 60 lb, 102 bags of 50 lb, or 61 bags of 80 lb. Nearly all of them, back to back, is a long day by hand.
How much does one 80 lb bag cover?+
0.60 cu ft — about 1.4 sq ft at 5 inches, or 1.8 sq ft at 4 inches. A single bag does not finish a post hole; two usually do.
Bags or a ready-mix truck?+
By price, the truck wins almost immediately — the calculator shows the crossover point. Bags make sense only when the truck cannot get to the pour, the volume is very small, or you are pouring in stages.
Is 4 inches thick enough?+
For a patio or walkway, yes. Anything a vehicle drives on needs 5–6 inches with a compacted base and reinforcement, or it will crack at the edges.
Why does the plant add a short-load fee?+
A full truck carries 8–10 cu yd. Under about 3, the driver still spends the same time and fuel, so the plant charges a flat fee — often $50–$100 — regardless of how little you take.
Should I add extra for uneven ground?+
Yes. A dug subgrade is rarely flat, so 10% is standard and 15% is sensible when you are pouring onto new fill. Running short mid-pour is far worse than paying for a spare quarter yard.

Next in this project

The tools that come right before and after a pour.

TR
Written by TallyReno editorial · Reviewed by a licensed concrete contractor
Sources: bag yield data from manufacturer sheets, 2026 ready-mix price surveys. Re-checked November 19, 2026.
Last updated
November 19, 2026