Posts · rails · boards to buy

How many posts, rails
and pickets for this fence?

Every fence calculator tells you how many feet you need. This one tells you how many boards to buy — 8 ft or 16 ft stock, waste included.

ft
Measure the full line, including the gate openings.
ft
count
ft
in
in
Posts to set
14 posts
13 spans · 24 rails · 210 boards
Fence run100 ft
Spans between posts13
Spans lost to gates1
Rails needed24
Boards / pickets210
Post-hole concrete19 bags
Privacy 8 ft spacing 6 ft high

What to actually buy for the rails

Same rail count, two stock lengths. The longer board is not always cheaper once you price the waste.

8 ft stock
24 boards · 0 ft waste
$216
fits in a pickup
16 ft stock
12 boards · 0 ft waste
$204
needs a trailer
16 ft stock comes out about $12 cheaper here.

Where the money goes

Materials total$0

What a contractor will charge

Typical installed ranges are below. Your run length, style and height are calculated above — read them out when you call local crews.

Typical installed price: $28–$45 per linear ft, privacy, 6 ft

Concrete per post, by hole size

The number nobody quotes you until the bags are in the cart. Frost depth decides it more than post height.

HoleDepthConcrete60 lb bags
8 in24 in0.70 cu ft2
8 in30 in0.87 cu ft2
10 in30 in1.36 cu ft3
10 in36 in1.64 cu ft4
12 in36 in2.36 cu ft6
Cylinder volume, hole diameter × depth. A 6 ft fence in a cold climate still needs a 36 in footing — depth is about frost, not height.

Watch the plinth and rails go onto posts

A third-party tutorial on YouTube — not our footage. Nothing loads until you press play; the measurements and opinions belong to the channel, not to us.

How To Install A Plinth And Rails For A Picket Fence - DIY At Bunnings video thumbnail from Bunnings Warehouse 6:56
Video · YouTube

How To Install A Plinth And Rails For A Picket Fence - DIY At Bunnings

Bunnings fits the plinth and rails onto standing posts: fixing blocks first, then the plinth, then the rails the pickets hang on. Runs 6:56.

By Bunnings Warehouse·6:56·Open on YouTube

What the numbers describe

Spacing is post centre to post centre. Height is measured from the ground line, not the buried end. The drawing is to your run length, so the posts, bays and pickets counted here match the result above.

The drawing uses your run length, so the posts, rails and pickets on it are the same numbers as the result.
Posts, set below the frost line Rails, one per span per layer Boards / pickets

What to actually buy

A fence is posts, rails, boards and a bag of concrete per hole — four separate lines at the yard. This puts all of them in one order, with the cheaper rail length picked for you.

Purchase
Posts14 posts
Rails24 rails
Pickets / boards210
Concrete19 bags
Mix left after setting—
Best rail length8 ft
Gates1
Posts are counted at one per span plus one to close the run, and gates add their own posts. The concrete bag count assumes the hole size you entered and a 50 lb bag; a wider hole needs more bags per post.
Budget
Posts, rails, pickets
Accessories
Waste & rounding
Delivery
Labor
Sales tax
Total
Accessories means brackets, hinges, a gate latch and screws — type your own number. Post, picket, rail and concrete prices all come from the panel above; the rail line uses whichever length wastes less.
Where these numbers come from+

Formats assumed. Posts sit one per span, 8 ft apart, plus one to close the run. Two rails per span, pickets at 5.5 in of face. A 50 lb bag of concrete fills about 0.6 cu ft of hole — a wider or deeper hole takes more.

Not from us. Post, picket, rail and concrete prices come from the fields above. The rail line uses whichever stocked length leaves the less waste, and the comparison is shown further up the page.

The formula, step by step

Everything counts off the post line, not off the boards.

posts = ceil(length / spacing) + 1
rails = (spans − gate spans) × rails per span
boards = ceil(run in inches / (width + gap))
concrete = posts × hole volume

Worked example

100 ft at 8 ft spacing: 13 spans, so 14 posts. One 4 ft gate eats a whole span, leaving 12 spans × 2 rails = 24 rails. Boards: 96 ft of run at 5.5 in wide = 210 boards. Concrete at 0.6 cu ft per hole = 8.4 cu ft, or 19 bags of 60 lb.

Why the stock length matters

A rail spans one gap, so an 8 ft spacing means one 8 ft board per rail. A 6 ft spacing leaves 2 ft of waste on every 8 ft board — but a 16 ft board yields two rails with 4 ft left over, which is where the money is.

Assumptions & limits

  • Posts are evenly spaced; the last span absorbs any remainder.
  • Each gate consumes a full span and needs its own heavier gate posts.
  • Board count assumes a straight run; corners add posts, not boards.
  • Stock lengths are 8 ft and 16 ft with no saw kerf allowance.
  • Fasteners, caps, and post bases are not included.
  • Prices are USD estimates, not live quotes; lumber swings by region.

Last reviewed

November 19, 2026 — spacing conventions and 2026 lumber pricing re-checked.

Common questions

How many posts for 100 ft of fence?+
14 posts at 8 ft spacing (13 spans plus one), or 18 posts at 6 ft spacing. The count is always spans plus one because both ends need a post.
How much concrete per fence post?+
An 8 in hole 30 in deep takes about 0.87 cu ft — two 60 lb bags. A 10 in hole at the same depth takes 1.36 cu ft, or three bags. Fill to just above the hole, and slope the top so water runs off.
8 ft or 6 ft post spacing?+
8 ft is standard and saves about a fifth of your posts. Go to 6 ft for tall privacy fences in windy spots, or where the fence carries a gate or a load.
Should I buy 8 ft or 16 ft rail boards?+
At 8 ft spacing they are the same material, so 16 ft halves the board count and costs a little less — but you need a trailer to get it home. At 6 ft spacing the 16 ft board is clearly better: two rails per board instead of one with 2 ft wasted.
Do gates get counted as fence?+
No. A gate occupies a full span with no rails or boards, and its posts usually need to be larger and set deeper. Measure the opening, then let the calculator subtract it.

Next in this project

The tools that touch a fence build.

TR
Written by TallyReno editorial · Reviewed by a licensed fencing contractor
Sources: post spacing conventions, bag yield sheets, 2026 lumber and install price surveys. Re-checked November 19, 2026.
Last updated
November 19, 2026