Most calculators give you one block count for the whole patio. The soldier course around the edge is laid the other way round, so it takes a different number of blocks, and it changes how many cuts you throw away. This page counts them separately, then adds the gravel and sand underneath.
The border adds about a fifth of a block per square foot.
The border ring is drawn first, then the field fills in row by row. Tan blocks are whole, rust blocks are cut, and the border is counted as its own run.
A paver is only as flat as the layers below it. The calculator sizes the gravel and the sand to the same patio, so the three numbers add up to one order.
The blocks are the same size. What changes is how many get cut at the edges — and cutting is where money quietly leaves.
| Pattern | Waste | Blocks | Cut | Cost |
|---|
Pavers are counted in pieces, but the base and the sand are counted in yards. This puts the piece order and the money on one line so the pallet and the pile agree.
| Pavers | |
| Accessories | |
| Waste & rounding | |
| Delivery | |
| Labor | |
| Sales tax | |
| Total |
Formats assumed. Base gravel is taken at 4 in compacted, bedding sand at 1 in, and gravel ordered 30% over the loose volume because it compacts. Pattern waste runs 5% running bond, 8% basketweave, 15% herringbone.
Not from us. Paver, gravel and sand prices come from the fields above. Piece counts include the soldier border and the pattern waste; cuts are bought whole and thrown away cut, which is what the waste rate pays for.
A soldier course is a ring of pavers turned 90°, so their long side follows the edge. Because they are rotated, a 4 × 8 in brick covers 8 in of edge per block, not 4. The ring is half a block wide, so it cuts a strip off the field on all four sides.
The extra four are the corner closers. On a 16 × 12 ft patio with 4 × 8 brick that is 56 ft of edge, or 84 blocks plus four corners.
With a border, the field is measured from the inside face of the ring. Without one, the field runs to the line and the edges take more cuts.
Running bond loses about 5% to edge cuts. Basketweave loses around 8%, because the alternating pairs rarely divide the width evenly. Herringbone loses 15% or more: every 45° edge is a triangular cut with nothing useful left over.
That is not an exact figure — it is the number of blocks you will pull off the pallet, cut, and throw half away. It is the reason a pallet count is never the same as a square-foot count.
The patio is 192 sq ft. The border ring is half a block wide — 2 in — so the field is 15.67 × 11.67 ft, or 182.8 sq ft. At 32 sq in per brick that is 823 blocks before waste, 864 with 5%. The ring adds 84 plus four corner closers. Total: 952 blocks.
Under it: 4 in of gravel is 2.4 cu yd compacted, and you order about 3.1 because loose gravel shrinks by a quarter under the plate. Bedding sand at 1 in is 0.6 cu yd.
Almost every paver calculator returns one block count and one waste percentage. Neither tells you that the border is a separate run with its own block count, or that herringbone triples the number of blocks you cut in half. Those two facts move the order by 10–20%, which is a pallet.
Pavers sit on a base, meet a wall, and usually follow a fence line.